This project relocated the Nike sample sewing group into a 40,000 sq. ft. facility
within a seven week concurrent design and construction schedule. Freestanding office and service pavilions with gently
curving, translucent roofs, are arranged along a diagonal circulation spine. The spine bisects
the main production area and connects the thimble-shaped reception area to a cubic terminus
at the rear exit. The project, completed on time and under budget, is a creative low-cost
solution that reflects Nike's specific budget requirements.
|