O R E G O N

This project relocated the Nike sample sewing group into a 40,000 sq. ft. facility within a seven week concurrent design and construction schedule. Freestanding office and service pavilions with gently curving, translucent roofs, are arranged along a diagonal circulation spine. The spine bisects the main production area and connects the thimble-shaped reception area to a cubic terminus at the rear exit. The project, completed on time and under budget, is a creative low-cost solution that reflects Nike's specific budget requirements.